Spearheaded a transformative communications and network infrastructure overhaul for a 38-user Erie-based nonprofit. They struggled with an outdated phone system and 15 counselors needing to manage costly, separate work cell phones in addition to personal devices.
As Founder/President of Longnecker DataCom, my team delivered a multifaceted
Spearheaded a transformative communications and network infrastructure overhaul for a 38-user Erie-based nonprofit. They struggled with an outdated phone system and 15 counselors needing to manage costly, separate work cell phones in addition to personal devices.
As Founder/President of Longnecker DataCom, my team delivered a multifaceted solution:
Network Modernization: Executed a full network room revitalization including new Cat 6 cabling for PoE readiness, installation of a locking data cabinet for enhanced security, and a new high-performance PoE switch to boost network reliability.
Unified Communications Implementation: Migrated all 38 users from their legacy system and the 15 Verizon Wireless lines to a cutting-edge Cisco UCX with Webex platform (via TPx). This provided new desk phones and empowered counselors with a single-app experience on their personal smartphones for work calls/texts, eliminating redundant devices.
Dedicated Training & Post-Cutover Support: Ensured a seamless transition with comprehensive staff training and dedicated on-site support for system management, feature adoption, and ongoing customization based on their operational needs.
Key Outcomes: This comprehensive modernization yielded significant reductions in monthly operational costs, vastly improved communication efficiency and collaboration for all users, and substantially enhanced network security and reliability. Crucially, it empowered the nonprofit to dedicate more resources to their vital community mission, supported by a scalable and future-proof technology foundation.
View Project on LinkedIn: https://www.linkedin.com/in/danlongnecker/details/projects/
At Longnecker DataCom, we were tasked with a complete cabling overhaul for an operational elementary school. In just 3 months, we successfully recabled the entire facility, spanning 3 floors with 34,000 feet of Cat 6E Plenum wire. We worked closely with the school's staff, IT firm, and contractors to ensure the project was completed seaml
At Longnecker DataCom, we were tasked with a complete cabling overhaul for an operational elementary school. In just 3 months, we successfully recabled the entire facility, spanning 3 floors with 34,000 feet of Cat 6E Plenum wire. We worked closely with the school's staff, IT firm, and contractors to ensure the project was completed seamlessly.
Key Responsibilities:
Rewiring: Ran and terminated 465 Cat 6 jacks across 105 wall box locations.
Wireless Infrastructure: Installed 22 Cat 6E cables for Access Point Locations in ceiling-mounted surface boxes for enhanced WiFi service.
Server Room Upgrade: Installed a 7ft 45U 2-post data rack alongside the existing rack to house new wiring and network switches. The rack was mounted using a data rack ladder system, which doubles as a wiring tray.
Server Room Organization: Updated patch cord cabling with 221 slimline patch cables, improving organization and efficiency.
Collaboration & Execution:
From consulting and design to installation and cutover, Longnecker DataCom worked seamlessly with all teams to transition the school to modern technology. We transformed the outdated system into a high-performance, reliable network.
Impact & Results:
Completed the project with minimal disruption, maintaining school operations throughout.
Delivered a future-proof network that will support the school's growing technology needs.
Improved the server room’s organization, making maintenance and future upgrades easier.
This project underscores Longnecker DataCom's dedication to providing cutting-edge network infrastructure that enhances functionality and efficiency in educational environments.
At Longnecker DataCom, we were tasked with a complete cabling overhaul for an operational elementary school. In just 3 months, we successfully recabled the entire facility, spanning 3 floors with 34,000 feet of Cat 6E Plenum wire. We worked closely with the school's staff, IT firm, and contractors to ensure the project was completed seamlessly. Key Responsibilities: Rewiring: Ran and terminated 465 Cat 6 jacks across 105 wall box locations. Wireless Infrastructure: Installed 22 Cat 6E cables for Access Point Locations in ceiling-mounted surface boxes for enhanced WiFi service. Server Room Upgrade: Installed a 7ft 45U 2-post data rack alongside the existing rack to house new wiring and network switches. The rack was mounted using a data rack ladder system, which doubles as a wiring tray. Server Room Organization: Updated patch cord cabling with 221 slimline patch cables, improving organization and efficiency. Collaboration & Execution: From consulting and design to installation and cutover, Longnecker DataCom worked seamlessly with all teams to transition the school to modern technology. We transformed the outdated system into a high-performance, reliable network. Impact & Results: Completed the project with minimal disruption, maintaining school operations throughout. Delivered a future-proof network that will support the school's growing technology needs. Improved the server room’s organization, making maintenance and future upgrades easier. This project underscores Longnecker DataCom's dedication to providing cutting-edge network infrastructure that enhances functionality and efficiency in educational environments.
Skills: Project Management · Telecommunications · Network Infrastructure · Structured Cabling · Team Management
View Project on LinkedIn: https://www.linkedin.com/in/danlongnecker/details/projects/
Longnecker DataCom collaborated with the restaurant owner and IT team to design a new network infrastructure and camera system for a complete restaurant and sports bar renovation. Over the course of one year, we worked with the general contractor, subcontractors, and vendors to install 20,000 feet of Cat 6E cable, all while keeping the re
Longnecker DataCom collaborated with the restaurant owner and IT team to design a new network infrastructure and camera system for a complete restaurant and sports bar renovation. Over the course of one year, we worked with the general contractor, subcontractors, and vendors to install 20,000 feet of Cat 6E cable, all while keeping the restaurant operational.
Key Responsibilities:
-Installed 20,000 feet of Cat 6E cable to support IoT devices, including printers, workstations, and Access Points for both internal and guest Wi-Fi.
-Installed 25 Titanium IPC Motorized Varifocal Turret Cameras connected to a 32-Channel Titanium NVR for comprehensive security coverage.
-Mounted all equipment on a newly installed 7ft 45U 2-Post Data Rack to ensure organized and efficient wiring.
-Worked with the IT team to install Access Points in optimal locations for complete Wi-Fi coverage.
Collaboration & Execution:
The project required collaboration with multiple teams, including contractors, IT staff, and vendors, to ensure smooth implementation. Longnecker DataCom played a central role in planning, installation, and execution, upgrading the restaurant’s technology infrastructure.
Impact & Results:
-Delivered the project while keeping the restaurant open and operational throughout the renovation.
-Installed a future-proof system capable of supporting the restaurant's growth for years.
-Enhanced the restaurant’s security and connectivity with a new network and surveillance system.
This project highlights Longnecker DataCom's expertise in designing and executing scalable and reliable technology solutions for the hospitality industry.
Longnecker DataCom collaborated with the restaurant owner and IT team to design a new network infrastructure and camera system for a complete restaurant and sports bar renovation. Over the course of one year, we worked with the general contractor, subcontractors, and vendors to install 20,000 feet of Cat 6E cable, all while keeping the restaurant operational. Key Responsibilities: -Installed 20,000 feet of Cat 6E cable to support IoT devices, including printers, workstations, and Access Points for both internal and guest Wi-Fi. -Installed 25 Titanium IPC Motorized Varifocal Turret Cameras connected to a 32-Channel Titanium NVR for comprehensive security coverage. -Mounted all equipment on a newly installed 7ft 45U 2-Post Data Rack to ensure organized and efficient wiring. -Worked with the IT team to install Access Points in optimal locations for complete Wi-Fi coverage. Collaboration & Execution: The project required collaboration with multiple teams, including contractors, IT staff, and vendors, to ensure smooth implementation. Longnecker DataCom played a central role in planning, installation, and execution, upgrading the restaurant’s technology infrastructure. Impact & Results: -Delivered the project while keeping the restaurant open and operational throughout the renovation. -Installed a future-proof system capable of supporting the restaurant's growth for years. -Enhanced the restaurant’s security and connectivity with a new network and surveillance system. This project highlights Longnecker DataCom's expertise in designing and executing scalable and reliable technology solutions for the hospitality industry.
Skills: Project Management · Surveillance · Closed-Circuit Television (CCTV) · Telecommunications · Consulting · Network Infrastructure · Network Design
View Project on LinkedIn: https://www.linkedin.com/in/danlongnecker/details/projects/